BusinessHome Monday to Friday, 8am to 5pm Call us: 0191 543 3564
Blog

Moving office? Your business broadband checklist

A practical checklist for sorting broadband, leased lines, phones and WiFi when your business moves premises, so the new office works from the first morning.

Moving office is a good chance to improve your connection, but it is also one of the easiest ways to end up with a team sitting in a new building with no internet. Broadband and leased lines are not like electricity: they are not always ready to switch on when you get the keys, and the lead time depends on the building, the networks nearby and the type of connection you choose.

This checklist walks through what to do, and when, so your connection is ready when your people are.

Why broadband should be near the top of your moving list

Almost everything a modern business does depends on the connection: email, cloud software, card payments, phone calls and remote access for staff working elsewhere. If the new line is late, the rest of the move can be perfectly planned and you still cannot trade properly.

The single most useful thing you can do is start early. Ordering a connection takes minutes, but the work behind it can involve surveys, permissions from the landlord, engineer appointments and, for dedicated lines, building new fibre routes. None of that can be rushed at the last minute.

Before you sign the lease

If you are still choosing between buildings, connectivity is worth checking alongside parking, rent and floor space.

How long does it take to get broadband at a new office?

There is no single answer, which is exactly why starting early matters. As a general guide:

Business full fibre

Where full fibre already reaches the building, installation is often fairly straightforward. It may need an engineer visit to fit the equipment inside, and we book that and email you the date. If the fibre needs extending into the premises, or the building is new, it can take longer. Our installation page explains each stage.

Leased lines

Leased lines typically take longer than broadband. Each site is surveyed, and if new ducting, cabling or roadworks are needed to reach the building, the timeline can stretch to several weeks and sometimes a few months. Landlord permissions and access to the building can add to this. We will give you a realistic view for your site when we quote, but if a leased line is on your list, speak to us as soon as you have an address in mind.

Your moving office broadband checklist

As soon as you have a new address

Once the lease is agreed

In the weeks before the move

Moving week and after

What happens to your old broadband contract?

Moving does not normally end a contract. If you are still inside your minimum term, you may have to pay early termination charges, or your provider may be able to move the service to the new address, sometimes on a new term. Check before you commit to anything.

If your business has 10 or fewer staff, Ofcom's rules give you some extra protections, including notice when your minimum term is ending. Our guide to broadband contracts and your rights explains these in more detail.

Whatever your situation, avoid cancelling the old line too early. It is far easier to pay for a short overlap than to spend a week without a connection.

Phones, alarms and anything still on a copper line

The UK is retiring the old analogue telephone network, with the switch off due to finish by the end of January 2027. A move is the ideal time to stop relying on old copper phone lines altogether. Check whether your alarm, lift line, card machine or franking machine uses a phone line, and ask its supplier what it needs at the new premises.

Internet based phones are easy to move because they simply plug into your network. Our guide to the landline switch off for businesses covers what to check.

Plan for a gap, just in case

Even with good planning, things can slip: a landlord delays permission, or extra work is found during a survey. It is sensible to have a fallback, such as mobile broadband or hotspots from work phones, so key staff can keep working for a few days if needed.

A move is also a good time to think about backup for the long term. Our guide to backup broadband and failover explains the options.

Moving to a new office in the North East?

Tell us the new address as early as you can and we will tell you honestly what is available and what the timeline is likely to be. Check the new address, ask for a quote for a leased line, or contact our team in Sunderland to talk your move through.

Questions

Frequently asked questions

How early should I arrange broadband for a new office?

As early as you can, ideally before you sign the lease. Business full fibre can often be arranged fairly quickly, but leased lines usually take longer because the route has to be surveyed and sometimes built.

Does moving office end my broadband contract?

Not usually. Your contract normally runs until the end of its minimum term, so check whether your provider can move the service with you or whether early termination charges apply.

Can I keep my business phone number when I move?

Often yes. Many numbers can be ported to a new provider, and internet based phone systems can usually move with you wherever there is a good connection. Check with your phone provider before you give notice.

Do I need my landlord's permission for a new line?

If you lease the building, the landlord may need to agree to the installation, known as a wayleave. Ask early, because waiting for sign off is a common cause of delay.

See what you can get at your address

Availability and prices depend on your exact address. Enter your postcode to see the packages you can order, or ask our Sunderland team for a quote.